Modern Residential Complex
Residential Abuja, NG

Residential Building Wiring

YTech Engineering Services Ltd successfully completed the full electrical wiring and power distribution system for a newly constructed residential building in Abuja. The project included internal and external wiring, earthing, lighting installations, and load balancing ensuring complete compliance with Nigerian Electrical Standards and YTech’s safety protocols.

CATEGORY Electrical Installation
DURATION 18 Days
Rooms Wired 4
Building Wiring Progress
Conduit and Cable Laying
Distribution Board Installation
Lighting Fixture Setup
Lighting Fixture Setup

Project Overview

The project began with a comprehensive electrical design and load calculation to ensure safe distribution across the building. Our engineers carried out conduit wiring, circuit segregation, socket and lighting installations, and proper earthing for protection. All materials used were fire-resistant and certified for domestic electrical standards.

The final stage involved installing switchgear panels, testing continuity, insulation resistance, and grounding values to guarantee long-term reliability.

Key Achievements

Efficient Design

Executed a balanced and efficient power distribution layout for consistent voltage supply.

Safety First

Implemented advanced earthing and circuit protection to prevent electrical hazards.

Energy Optimization

Integrated low-energy LED lighting and efficient load balancing to reduce power waste.

Project Specifications

Total Wiring Length Over 2,000 Meters
Circuit Breakers 18 Units
Lighting Points 55 Fixtures
Sockets Installed 25 Power Outlets
Main Supply Single Phase 240V / 60A
Start Date January 2023
Commissioned Febuary 2023
Project Progress 100%